Coolroom installation · Perth and WA
Coolroom installation. Perth and WA.
How we install insulated panel coolrooms and freezer rooms across Perth and regional WA, from site checks to handover.
Built locally. Made to last.
Cool room installation, start to finish.
We install insulated panel coolrooms and freezer rooms for businesses and homes across Perth and regional WA, from our base in Rockingham. Below is our installation method, from site checks and set-out to walls, ceilings, floors, doors and handover.
Jobs run from small rooms to large warehouse ceilings. Our commercial and industrial panel installations follow the project's engineering specifications.
Our installations cover the insulated wall and ceiling panels, floor panels, trims, flashings, sealants and doors.
Coolroom panel installation, step by step.
01 / Site induction and checks
Each job's safe work method statement (SWMS) sets out the rooms, sizes, panel type and thickness. Before work starts, the crew completes the site induction and a pre-start meeting, and reads and signs the SWMS. We confirm the slab, access and set-out are ready.
02 / Deliver and store the panels
We unload panels by forklift or HIAB crane truck, using licensed operators, a spotter and an exclusion zone, into a laydown area close to the work. We check panels and trims for damage on delivery and store panels flat on bearers.
03 / Set out and fix the base
We set out the room to the drawings and confirm dimensions before anything is fixed. We lay the F-mould base on mastic, on a membrane first where the room has a floor, and screw it to the slab at 400 mm centres.
04 / Stand the walls
Mastic goes on the female joint, and each wall panel slides into the joint of the panel beside it. We rivet each panel to the F-mould at 400 mm centres, and walls stay braced or clamped until the ceiling and adjacent walls are fixed.
05 / Fit the ceiling and floor
Ceiling panels go in from a scissor lift or other elevating work platform (EWP) only, with at least two workers per panel. We seat each one fully into the wall haunch and fit suspension where required, and the final wall goes in only once the ceiling panels are secure. Where a room needs a panel floor, we lay it on membrane or plastic and mastic.
06 / Trim, seal and hang the doors
We rivet the trims and flashings, and seal joints with mastic, silicone, polyurethane sealant and expanding foam. Doors are handled by two workers or a lifting aid, and we fix and check sliding door tracks before the door is hung.
07 / Check and hand over
We test door operation before handover. We collect offcuts and swarf (metal shavings) as we go, and check panels are secure before the crew leaves the area each day.
Crew and supervision.
Our panel installers, tradesmen and labourers work under direct supervision, with a pre-start meeting every day. Our method calls for forklift drivers with a high risk work licence, EWP training for scissor lift operators and a construction induction (White Card) for the crew.
On builder-run sites, we work to the principal contractor's site rules and permits. The panel maker's installation guides and connection details are part of our method.
Supply and install, or subcontract.
We supply and install, work as a subcontractor, and do maintenance and repair. Our coolroom work includes jobs for Hungry Jack's and Woolworths. Tell us which service you need.
What to send
For a new installation, send the project location, plans, room dimensions and required temperature. If a builder, engineer or insurer has supplied a panel specification, include that too. For an existing room, tell us what needs attention. Let us know about vehicle access, the existing building and any work already completed.
Panel and thickness
Our standard coolroom walls and ceiling are 100 mm EPS (expanded polystyrene) panel, and freezer walls and ceilings are normally 150 mm. The final thickness and details follow the room's temperature and the project's specification.
A large project can use a different panel and thickness. Our February 2026 cold-store build used about 2,195 m² of 200 mm PIR (polyisocyanurate) for the coolrooms and freezers, and nearly 8,000 m² of panel in total.
The cold-store build in numbers ↗Installation projects.
EBOS Medical, Hazelmere (2025 – 2026)
8,700 m² of panel, including about 6,000 m² of suspended ceiling 11 m to 13 m above the floor, an 11 m high chiller and two freezers.
EBOS Medical project ↗Toll Health, Hazelmere (2025)
Insulated panel rooms 10 m high, built inside a warehouse, with 150 mm and 200 mm XFLAM walls, a 100 mm XFLAM ceiling, 600 m² of panel ceiling and a pressurised loading dock.
Toll Health project ↗Sizes are approximate.
Coolroom installation questions.
Do you install coolrooms outside Perth?
Yes. We're based in Rockingham and take jobs right across WA, with local south-metro work first.
Can you build a custom-sized coolroom?
Yes. Panel can be cut, measured and fitted to any shape or size.
Do you install cold rooms as well as coolrooms?
Yes. Whether you call it a cool room or a cold room, insulated panels form the walls and ceiling, and the floor where the room design includes one.
Do you repair coolrooms as well as install them?
Yes. We supply, install and repair coolrooms.
Can you install a coolroom at my home?
Yes. For a coolroom or freezer room at home, send the room size and intended temperature.